01. **必背——职业篇 1. PDCA:Plan、Do、Check、Action 策划、实施、检查、处置 2. PPAP:Production PartApproval Process生产件批准程序 3. APQP:Advanced ProductQuality Plannin**品**...

01. **必背——职业篇

1. PDCA:Plan、Do、Check、Action 策划、实施、检查、处置

2. PPAP:Production PartApproval Process生产件批准程序

3. APQP:Advanced ProductQuality Plannin**品**先期策划

4. FMEA:Potential FailureMode and Effects Analysis 潜在失效**及后果**

5. SPC:Statistical ProcessControl统计**控制

6. MSA:Measurement SystemAnalysis 测量系统控制

7. CP:Control Plan 控制计划

8. QSA:Quality SystemAsses**ent **体系评定

9. PPM:Parts Per Million 每百万零件不合格数

10. QM:Quality Manua**手册

11. QP:Quality Procedure**程序文件/Quality Planning**策划/Quality Plan **计划

12. CMK:机器能力指数

13. CPK:**能力指数

14. CAD:Computer-Aided Design 计算机辅助能力设计

15. OEE:Overall Equipment Effectiveness 设备总效率

16. QFD:Quality Function Deployment**功能展开

17. FIFO:First in, First out先进先出

18. COPS:Customer Oriented Processes顾客导向**

19. TCQ:Time、Cost、Quality时间、成本、**

20. MPS:Management Processes管理性**

21. SPS:Support Processes支持性**

22. TQM:Total Quality Management全面**管理

23. PQA:Product QualityAssurance产品**保证(免检)

24. QP-QC-QI:**三步曲,**计划-**控制-**改进

25. QAF:Quality Assurance File**保证文件

26. QAP:Quality Assurance Plan**保证计划

27. PFC:Process Flow Chart**流程图

28. QMS:Quality Management Systems**管理体系

29. JIT:Just In Time准时(交货)

30. ERP:Enterprise Requirement Planning企业需求计划

31. QC:Quality Control **控制

32. QA:Quality Audit **审核/Qality Assurance **保证

33. IQC:In Come Quality Control 进货**控制

34. IPQC:In Process Quality Control ****控制

35. FQC:Final Quality Control 成品**控制

36. OQC:Out Quality Control 出货**控制

37. 4M1E:Man、Machine、Material、Method、Environment人、机、料、法、环

38. 5W1H:Why、What、Who、When、Where、How 为何/做什么/谁做/时间/地点/如何做

39. 6S:Seiri、Seiton、Seiso、Seiketsu、Shitsuke、Safety 整理、整顿、清扫、清洁、素养、安全

40. TRI值:Total Record Injury(三种)可记录工伤值

41. SMART:精明原则,SpecificMeasurable Achievable Result Oriented Timed(具体的描述、可以测量的、可以通过努力实现的、有结果导向性的、有时间性的)

02. **必背——企业篇

1. 5S:5S管理

2. ABC:作业制成本制度(Activity-Based Costing)

3. ABB:实施作业制预算制度(Activity-Based Budgeting)

4. ABM:作业制成本管理(Activity-Base Management)

5. APS:先进规画与排程系统(Advanced Planning and Scheduling)

6. ASP:应用程序服务供货商(Application Service Provider)

7. ATP:可承诺量(Available To Promise)

8. AVL:认可的供货商清单(Approved Vendor List)

9. BOM:物料清单(Bill OfMaterial)

10. BPR:企业流程再造(Business Process Reengineering)

11. BSC:平衡记分卡(BalancedScoreCard)

12. BTF:计划生产(Build ToForecast)

13. BTO:订单生产(Build To Order)

14. CPM:要径法(Critical PathMethod)

15. CPM:每一百万个使用者会有几次抱怨(Complaintper Million)

16. CRM:客户关系管理(Customer Relationship Management)

17. CRP:产能需求规划(Capacity Requirements Planning)

18. CTO:客制化生产(ConfigurationTo Order)

19. DBR:限制驱导式排程法(Drum-Buffer-Rope)

20. DMT:成熟度验证(Design Maturing Testing)

21. DVT:设计验证(Design Verification Testing)

22. DRP:运销资源计划(DistributionResource Planning)

23. DSS:决策支持系统(Decision Support System)

24. EC:设计变更/工程变更(Engineer Change)

25. EC:电子商务(Electronic Commerce)

26. ECRN:原件规格更改通知(Engineer Change Request Notice)

27. EDI:电子数据交换(Electronic Data Interchange)

28. EIS:主管决策系统(Executive Information System)

29. EMC:电磁相容(ElectricMagnetic Capability)

30. EOQ:基本经济订购量(EconomicOrder Quantity)

31. ERP:企业资源规划(Enterprise Resource Planning)

32. FAE:应用工程师(Field Application Engineer)

33. FCST:预估(Forecast)

34. FMS:弹性制造系统(Flexible Manufacture System)

35. FQC:成品**管理(Finish or Final Quality Control)

36. IPQC: 制程**管理(In-Process Quality Control)

37. IQC:进料**管理(Incoming Quality Control)

38. ISO:国际**组织(International Organization for Standardization)

39. ISAR:首批样品认可(Initial Sample Approval Request)

40. JIT:实时管理(Just In Time)

41. KM:知识管理(Knowledge Management)

42. L4L:逐批订购法(Lot-for-Lot)

43. LTC:最小总成本法(Least Total Cost)

44. LUC:最小单位成本(Least Unit Cost)

45. MES:制造执行系统(Manufacturing Execution System)

46. MO:制令(Manufacture Order)

47. MPS:主生产排程(Master Production Schedule)

48. MRO:请修(购)单(Maintenance Repair Operation)

49. MRP:物料需求规划(Material Requirement Planning)

50. MRPII:制造资源计划(Manufacturing Resource Planning)

51. NFCF:更改预估量的通知(Notice forChanging Forecast)

52. OEM:委托代工(Original Equipment Manufacture)

53. ODM:委托设计与制造(Original Design & Manufacture)

54. OLAP:在线**处理(On-Line Analytical Processing)

55. OLTP:在线交易处理(On-Line Transaction Processing)

56. OPT:**生产技术(Optimized Production Technology)

57. OQC:出货**管理(Out-goingQuality Control)

58. PDCA:PDCA管理循环(Plan-Do-Check-Action)

59. PDM:产品数据管理系统(Product Data Management)

60. PERT:计划评核术(Program Evaluation and Review Technique)

61. PO:订单(Purchase Order)

62. POH:预估在手量(Product onHand)

63. PR:采购申请(Purchase Request)

64. QA:品质保证(Quality Assurance)

65. QC:**管理(Quality Control)

66. QCC:品管圈(Quality ControlCircle)

67. QE:品质工程(Quality Engineering)

68. RCCP:粗略产能规划(Rough CutCapacity Planning)

**. RMA:退货验收(Returned Material Approval)

70. ROP:再订购点(Re-Order Point)

71. SCM:供应链管理(Supply ChainManagement)

72. SFC:现场控制(Shop Floor Control)

73. SIS:策略信息系统(Strategic Information System)

74. SO:订单(Sales Order)

75. SOR:特殊订单需求(Special OrderRequest)

76. SPC:统计制程管制(Statistic Process Control)

77. TOC:限制理论(Theory of Constraints)

78. TPM:全面生产管理(Total Production Management)

79. TQC:全面**管理(Total Quality Control)

80. TQM:全面品质管理(Total Quality Management)

81. WIP:在制品(Work In Process)

03. **必背——部门篇

QS:Quality system 品质系统

CS:Coutomer Sevice 客户服务

QC:Quality control 品质管理

IQC:Incoming quality control 进料检验

LQC:Line Quality Control 生产线品质控制

IPQC:In process quality control 制程检验

FQC:Final quality control 最终检验

OQC:Outgoing quality control 出货检验

QA:Quality assurance 品质保证

SQA:Source(supplier)Quality Assurance 供应商品质保证(VQA)

CQA:Customer Quality Assurance客户**保证

PQA:Process Quality Assurance 制程品质保证

QE:Quality engineer 品质工程

CE:component engineering零件工程

EE:equipment engineering设备工程

ME:manufacturing engineering制造工程

TE:testing engineering测试工程

PPE:Product Engineer 产品工程

IE:Industrial engineer 工业工程

ADM:Administration Department行政部

RMA:客户退回维修

CSDI:检修

PC:Producing Control生管

MC:Mater Control物管

GAD:General Affairs Dept总务部

A/D:Accountant /Finance Dept会计

LAB:Laboratory实验室

DOE:实验设计

HR:人资

PMC:企划

RD:研发

W/H:仓库

SI:客验

PD:Product Department生产部

PA:采购(PUR: Purchaing Dept)

SMT:Surface mount technology 表面粘着技术

MFG:Manufacturing 制造

MIS:Management information system 资迅管理系统

DCC:document control center 文件管制中心

04. **必背——场内作业

QT:Quality target品质目标

QP:Quality policy目标方针

QI:Quality improvement品质**

CRITICAL DEFECT:严重缺点(CR)

MAJOR DEFECT:主要缺点(MA)

MINOR DEFECT:次要缺点(MI)

MAX:Maximum最大值

MIN:Minimum最小值

DIA iameter直径

DIM imension尺寸

LCL:Lower control limit管制下限

UCL:Upper control limit管制上限

EMI:电磁干扰

ESD:静电防护

EPA:静电保护区域

ECN:工程变更

ECO:Engineering change order工程改动要求(客户)

ECR:工程变更需求单

CPI:Continuous Process Improvement 连续工序**

Compatibility:兼容性

Marking:标记

DWG rawing图面

Standardization:**化

Consensus:一致

Code:代码

ZD:Zero defect零缺点

Tolerance:公差

Subject matter:主要事项

Auditor:审核员

BOM:Bill of material物料清单

Rework:重工

ID:identification识别,鉴别,证明

PILOT RUN:(试投产)

FAI:首件检查

FPIR:First Piece Inspection Report首件检查报告

F**:首件确认

SPC:统计制程管制

CP:capability index(准确度)

CPK:capability index of process

PMP:制程管理计划(生产管制计划)

MPI:制程**

DAS efects Analysis System 缺陷**系统

PPB:十亿分之一

Flux:助焊剂

P/N:料号

L/N:Lot Number批号

Version:版本

Quantity:数量

Valid date:有效日期

MIL-STD:Military-Standard军用**

ICT:In Circuit Test (线路测试)

ATE:Automatic Test Equipment自动测试设备

MO:Manafacture Order生产单

T/U:Touch Up (锡面修补)

I/N:手插件

P/T:初测

F/T:Function Test(功能测试-终测)

AS:组立

P/K:包装

TQM:Total quality control全面品质管理

MDA:manufacturing defect analysis制程不良**(ICT)

RUN-IN:老化实验

HI-pot:高压测试

FMI:Frequency Modulation Inspect高频测试

DPPM:Defect Part Per Million

(不良率的一种表达**:百万分之一)1000PPM即为0.1%

Corrective Action:(CAR**对策)

ACC:允收

REJ:拒收

S/S:Sample size抽样检验样本大小

SI-SIV:Special I-Special IV特殊抽样水平等级

CON:Concession / Waive特采

ISO:国际**化组织

ISA:Industry Standard Architecture工业**体制结构

OBA:开箱稽核

FIFO:先进先出

PDCA:管理循环

Plan do check action:计划,执行,检查,总结

WIP:在制品(半成品)

S/O:Sales Order (业务订单)

P/O:Purchase Order (采购订单)

P/R:Purchase Request (请购单)

AQL:acceptable quality level允收品质水准

LQL:Limiting quality level最低品质水准

QVL:qualified vendor list合格供应商名册

AVL:认可的供货商清单(Approved Vendor List)

QCD:Quality cost delivery(品质,交期,成本)

MPM:Manufacturing project management制造专案管理

KPI:Key performance indicate重要绩效指标

MVT:Manufacturing Verification Test制造验证试产

Q/R/S:Quality/Reliability/Service**/可靠度/服务

STL:ship to line(料到上线)

NTF:No trouble found误判

CIP:capacity improvement plan(产能**计划)

MRB:material review board(物料审核小组)

MRB:Material reject bill退货单

JIT:just in time(即时管理)

5S:seiri seiton seiso seiketsu shitsuke(整理,整顿,清扫,清洁,修养)

SOP:standard operation process(**作业程序)

SIP:Specification inspection process制程检验规格

TOP:Test Operation Process (测试作业流程)

WI:working instruction(作业指导书)

SMD:surface mounting device(表面粘着原件)

FAR:failure aualysis report故障**报告

CAR:Corrective action report**报告

BPR:企业流程再造(Business Process Reengineering)

ISAR:首批样品认可(Initial Sample Approval Request)

JIT:实时管理 (Just In Time)

QCC:品管圈 (Quality Control Circle)

ED:Engineering Department(工程部)

TQEM:Total Quality Environment Management(全面品质**管理)

PD:Production Department(制造)

LOG:Logistics(后勤支持)

Shipping:(进出口)

AOQ:Average Output Quality平均出货**

AOQL:Average Output Quality Level平均出货**水平

FMEA:failure model effectiveness analysis失效****

CRB:Change Review Board(工程变更会议)

CSA:Customer Simulate Analysis客户模拟**

SQMS:Supplier Quality Management System供应商品质管理系统

QIT:Quality Improvement Team 品质**小组

QIP:Quality Improvement Plan品质**计划

CIP:Continual Improvement Plan****计划

M.Q.F.S:Material Quality Feedback Sheet(来料品质回馈单)

SCAR:Supplier Corrective Action Report(供货商**对策报告)

8D Sheet: 8 Disciplines sheet(8D单)

PDCA:PDCA (Plan-Do-Check-Action) (管理循环)

MPQ:Material Packing Quantity (物料最小包装量)

DSCN:Delivery Schedule Change Notice (交期变更通知)

QAPS:Quality Assurance Process Sheet (品质工程表)

DRP:运销资源计划 (Distribution Resource Planning)

DSS:决策支持系统 (Decision Support System)

EC:电子商务 (Electronic Commerce)

EDI:电子资料交换 (Electronic Data Interchange)

EIS:主管决策系统 (Excutive Information System)

ERP:企业资源规划 (Enterprise Resource Planning)

FMS :弹性制造系统 (Flexible Manufacture System)

KM :知识管理 (Knowledge Management)

4L :逐批订购法 (Lot-for-Lot)

LTC :最小总成本法 (Least Total Cost)

LUC :最小单位成本 (Least Unit Cost)

MES :制造执行系统 (Manufacturing Execution System)

MPS :主生产排程 (Master Production Schedule)

MRP :物料需求规划 (Material Requirement Planning)

MRPⅡ:制造资源计划 (Manufacturing Resource Planning)

OEM :委托代工 (Original Equipment Manufacture)

ODM :委托设计与制造 (Original Design & Manufacture)

OLAP:线上**处理 (On-Line Analytical Processing)

OLTP:线上交易处理 (On-Line Transaction Processing)

OPT :**生产技术 (Optimized Production Technology)

PDCA:PDCA管理循环 (Plan-Do-Check-Action)

PDM:产品数据管理系统 (Product Data Management)

RCCP:粗略产能规划 (Rough Cut Capacity Planning)

SCM :供应链管理 (Supply Chain Management)

SFC :现场控制 (Shop Floor Control)

TOC:限制理论 (Theory of Constraints)

TQC :全面品质管制 (Total Quality Control)

FYI/R:for your information/reference仅供参考

ASAP:尽快

S/T:Standard time**时间

TPM:total production maintenance:全面生产保养

ESD Wrist strap:静电环

IT:information technology信息技术,资讯科学

CEO:Chief Executive Officer执行总裁

COO:Chief Operaring Officer首席业务总裁

SWOT:Strength,Weakness,Opportunity,Threat 优势﹐弱点﹐机会﹐威胁

Competence:专业能力

Communication:有效沟通

Cooperation:统御融合

Vibration Testing:振动测试

IDP:Individual Development Plan个人**计划

MRP:Material Requirement Planning物料需求计划

MAT'S:Material材料

LRR:Lot Rejeet Rate批退率

ATIN:Attention知会

3C:Computer,Communication , Consumer electronic消费性电子

5W1H:When , Where , Who , What , Why , Ho

5M:Man , Machine , Material , Method , Measurement人,机器,材料,方法,测量

4MIE:Man,Material,Machine,Method,Environment 人力,物力,财务,技术,时间(资源)

7M1I:Manpower,Machine , Material , Method, Market , Management , Money , Information人力, 机器, 材料, 方法,市场, 管理, 资金, 资讯

Accuracy 准确度

Action 行动

Activity 活动

Analysis Covariance 协方差**

Analysis of Variance 方差**

Approved 承认

Attribute 计数值

Average 平均数

Balance sheet 资产负债对照表

Binomial 二项分配

Brainstorming Techniques 脑力风暴法

Cause and Effect Matrix 因果图(鱼骨图)

CL:Center Line 中心线

Check Sheets 检查表

Complaint 投诉

Conformity 合格(符合)

Control 控制

Control chart 控制(管制)图

Correction 纠正

Correlation Methods 相关**法

CPI:continuouse Process Improvement 连续工序**

Cross Tabulation Tables 交叉表

CS:Customer Sevice 客(户)服(务)中心

DSA:Defects Analysis System 缺陷**系统

Data 数据 Deion:品名

DCC:Document Control Center 文控中心

Decision 决策、判定

Defects per unit 单位缺点数

Deion 描述

Device 装置

Do 执行

DOE:Design of Experiments 实验设计

Element 元素

Engineering recbnology 工程技

Environmental **

Equipment 设备

Estimated accumulative frequency 计算估计累计数

EV:Equipment Variation 设备变异

External Failure 外部失效,外部缺陷

FA:Failure Analysis 失效**

Fact control 事实管理

Fatigue 疲劳

FMEA:Failure Mode and Effect Analysis失效**与效果**

FP:First-Pass Yield (第一次通过)合格率

FQA:Final Quality Assurance 最终品质保证

FQC:Final Quality control 最终品质控制

Gauge system 测量系统

Grade 等级

Histogram 直方图

Improvement **

Initial review 先期审查

Inspection 检验

Internal Failure 内部失效、内部缺陷

IPQC:In Process Quality Control 制程品质控制

IQC:Incomming Quality Control 来料品质控制

IS:International Organization for Standardization 国际**化组织

LCL:Lower Control limit 管制下限

LQC:Line Quality Control 生产线品质控制

LSL:Lower Size Limit 规格下限

Machine 机械

Manage 管理

Materials 物料

Measurement 测量

Median 中位数

MSA:Measurement System Analysis 测量系统**

Occurrence 发生率

Operation Instruction 作业指导书

Organization 组织

Parto 柏拉图

PPM arts per Million (百万分之)不良率

Plan 计划

Policy 方针

Population 群体

PQA: Process Quality Assurance 制程品质保证

Practice 实务(践)

Prevention 预防

Probability 机率

Probability density function 机率密度函数

Procedure 流程

Process **

Process capability analysis 制程能力**(图)

Process control and Process capability 制程管制与制程能力

Product 产品

Production 生产

Projects 项目

QA: Quality Assurance 品质保证

QC: Quality Control 品质控制

QE: Quality Engineering 品质工程

QFD: Quality Function Desgin 品质机能展开(法)

Quality **

Quality manual 品质手册

Quality policy 品质政策(**方针)

Random experiment 随机试验

Random numbers 随机数

R:Range 全距(极差)

Reject 拒收

Repair 返修

Repeatusility 再现性

Reproducibility 再生性

Requirement 要求

Responsibilities 职责

Review 评审

Reword 返工

Rolled yield 直通率

RPN:Risk Priority Number 风险系数

Sample 抽样,样本

Sample space 样本空间

Sampling with replacement 放回抽样

Sampling without replacement 不放回抽样

Scatter diagram 散布图**

Scrap 报废

Simple random sampling 简单随机取样

Size 规格

SL:Size Line 规格中心线

Stratified random sampling 分层随机抽样

SOP:Standard Operation Procedure **作业书

SPC:Statistical Process Control 统计制程管制

Specification 规范

SQA:Source(Supplier)Quality Assurance 供货商品质保证

Stage sampling 分段随机抽样

Standard Deviation **差

Sum of squares 平方和

Taguchi-method 田口(试验)方法

Theory 原理

TQC:Total Quality Control 全面品质控制

TQM:Total Quality Management 全面品质管理

Traceablity 追溯

UCL:Upper Control Limit 管制(控制)上限

USL:Upper Size Limit 规格上限

Validation 确认

Variable 计量值

Verification 验证

Version 版本

VOC:Voice of Customer 客户需求

VOE:Voice of Engineer 工程需求

Inventory stock report:庫存清单报告

Sales order report:出货报告